SpaceX — Horizon Hyperscale Campus
← Back to Portfolio
Commercial · East of US 191, near Apache Generating Station · Cochise County, AZ

SpaceX — Horizon Hyperscale Campus

Project Type
Independent Full-Design Concept
Date
November 2026
Location
East of US 191, near Apache Generating Station · Cochise County, AZ
Studio
Tristan Scott Design
Highlights
Independent ProposalFull-Design Vision

Horizon reimagines the data-center campus as a cohesive piece of aerospace-inspired desert architecture. Two sweeping, bronze-screened wings frame a landscaped canyon atrium, with softly rounded office fronts, deeply recessed glazing and glass skybridges connecting the workplace. The approved organic-futurist reception brings a bold sculptural graphite-and-bronze counter, an impactful SpaceX backdrop, flowing ceiling forms and natural lobby planting into one welcoming arrival. Signature chamfered rack frames and selected acoustic LED ceiling panels extend that language through separately enclosed computing, cooling and operations galleries. Workplace interiors, architecture and landscape are designed as one coordinated experience, not disconnected visual packages. Photovoltaic roof surfaces and a dry rainwater-collection landscape remain concepts for investigation—not validated performance claims. This is TSD’s independent full-design proposal, not a reproduction of the county-filed plan, an approved development or a commissioned SpaceX project.

Bronze-screened

Rounded office wings & protected glazing

Canyon atrium

Workplace gathering & enclosed technical galleries

Integrated

Architecture, interiors & landscape design

Exploratory

Solar shading & rainwater-collection concepts

A complete design vision. A grounded starting point.

The county-filed Cochise site

These studies respond to application SU26-22: the proposed campus on the east side of U.S. Highway 191, adjoining Apache Generating Station lands near Cochise, in unincorporated Cochise County, Arizona 85606. The October 30 filing identifies Tombstone Resources L.L.C. as the applicant and an approximately 747-acre site across 31 listed parcels.

We use the filed parcel set—not the generating station’s street address or the meeting venue—as the location reference. The county map and application below identify that site. No numbered project address or surveyed map point is assigned here, and the renderings do not establish parcel boundaries, precise building placement or an approved site plan.

Pending county review — not approved

The county’s November 6 update states that no approval determination has been made. The formal Planning & Zoning hearing is listed for December 9, 2026 at 2 p.m.. The November 4 SpaceX-hosted community meeting was not a county approval hearing.

View all 31 county-listed parcel references

AEPCO group in the application

204-23-004 · 204-23-005D · 204-23-005E · 204-23-005F · 204-23-005G · 204-23-005H · 204-23-006A · 204-23-006B · 204-23-007A · 205-03-001B (portion) · 205-03-002A · 205-03-002B · 205-03-002C · 205-03-002D · 205-03-007 · 205-03-008 (portion) · 205-03-009 · 205-03-010A · 205-03-010B · 205-03-011A · 205-03-011B · 205-03-012 · 205-03-013 · 205-03-016 · 205-03-017 · 205-04-001

Southline group in the application

205-14-003B · 205-14-004A · 205-16-004 · 205-16-005 · 205-18-001

Source: Appendix C, page 20 of the filed application. Partial-parcel qualifiers are retained. The filing notes a pending transfer appraisal/survey for parcel 205-03-009; a land-disposal approval is not approval of the data-center project.

A design appointment—not just a rendering package

We want to shape the facility, not simply illustrate someone else’s plans. Our proposed full-design role connects campus identity, arrival, workplace interiors, material selection and landscape into one coordinated vision, developed alongside the appropriate local architecture-of-record, engineering and specialist teams.

One organic-futurist language connects three distinct scales: Relay’s compact desert arc, Meridian’s folded regional canyon and Horizon’s bronze-screened wings and planted atrium. Each reception, workplace and operations environment is individually tailored—not copied between facilities. Sculptural counters, signature rack frames, selected acoustic LED panels and natural lobby planting connect the human experience to separately enclosed technical galleries.

These are alternative design scales, not three announced SpaceX projects or reproductions of the filed nine-building scheme. Rack detailing, ceiling systems, containment and service clearances remain architectural concepts for coordination with the specialist teams, not validated equipment or engineered layouts.

Power, cooling, water demand, acoustics, ecological impacts, security and permitting require site-specific studies. Solar tracking, shading and rainwater collection are concepts for technical evaluation; the visualizations do not establish performance or regulatory compliance. The design vision would be coordinated with the construction team before execution.

Source context checked November 7, 2026. Tristan Scott Design is not affiliated with, endorsed by or retained by SpaceX or Tombstone Resources for these studies.

Explore a different design scale.

Horizon · viewing

Hyperscale campus study · Nine coordinated views

Explore Meridian

Regional campus study · Nine coordinated views

Explore Relay

Compact edge-facility study · Nine coordinated views

Interested in the Horizon approach? Let’s discuss a full-design role for your facility and how it would be coordinated with your engineering and construction team.

Discuss Horizon design

Alternative independent studies—not three announced developments. Read the Cochise County proposal overview.