Relay translates our organic-futurist design language into a compact desert-arc facility. A flowing graphite roof, fine bronze shading and a sandstone arrival portal establish its own identity rather than borrowing Horizon’s larger twin-wing composition. Inside, a human-scaled sculptural check-in counter, a restrained curved acoustic LED ceiling and naturally planted lobby lead to a small workplace and focused operations studio. Signature graphite-and-metal rack frames, orderly cooling interfaces and selected acoustic LED panels carry the same architectural language into enclosed technical galleries. A small dry lightwell brings daylight and a place to pause into the compact plan. Architecture, interiors, equipment presentation and landscape are considered together as an independent full-design vision—not an announced or commissioned SpaceX development.
Individually scaled reception & workplace
Bronze-shaded graphite roof identity
Enclosed racks & acoustic LED concepts
Architecture, interiors & site vision
Independent Cochise County Design Proposal
These studies respond to application SU26-22: the proposed campus on the east side of U.S. Highway 191, adjoining Apache Generating Station lands near Cochise, in unincorporated Cochise County, Arizona 85606. The October 30 filing identifies Tombstone Resources L.L.C. as the applicant and an approximately 747-acre site across 31 listed parcels.
We use the filed parcel set—not the generating station’s street address or the meeting venue—as the location reference. The county map and application below identify that site. No numbered project address or surveyed map point is assigned here, and the renderings do not establish parcel boundaries, precise building placement or an approved site plan.
Pending county review — not approved
The county’s November 6 update states that no approval determination has been made. The formal Planning & Zoning hearing is listed for December 9, 2026 at 2 p.m.. The November 4 SpaceX-hosted community meeting was not a county approval hearing.
204-23-004 · 204-23-005D · 204-23-005E · 204-23-005F · 204-23-005G · 204-23-005H · 204-23-006A · 204-23-006B · 204-23-007A · 205-03-001B (portion) · 205-03-002A · 205-03-002B · 205-03-002C · 205-03-002D · 205-03-007 · 205-03-008 (portion) · 205-03-009 · 205-03-010A · 205-03-010B · 205-03-011A · 205-03-011B · 205-03-012 · 205-03-013 · 205-03-016 · 205-03-017 · 205-04-001
205-14-003B · 205-14-004A · 205-16-004 · 205-16-005 · 205-18-001
Source: Appendix C, page 20 of the filed application. Partial-parcel qualifiers are retained. The filing notes a pending transfer appraisal/survey for parcel 205-03-009; a land-disposal approval is not approval of the data-center project.
We want to shape the facility, not simply illustrate someone else’s plans. Our proposed full-design role connects campus identity, arrival, workplace interiors, material selection and landscape into one coordinated vision, developed alongside the appropriate local architecture-of-record, engineering and specialist teams.
One organic-futurist language connects three distinct scales: Relay’s compact desert arc, Meridian’s folded regional canyon and Horizon’s bronze-screened wings and planted atrium. Each reception, workplace and operations environment is individually tailored—not copied between facilities. Sculptural counters, signature rack frames, selected acoustic LED panels and natural lobby planting connect the human experience to separately enclosed technical galleries.
These are alternative design scales, not three announced SpaceX projects or reproductions of the filed nine-building scheme. Rack detailing, ceiling systems, containment and service clearances remain architectural concepts for coordination with the specialist teams, not validated equipment or engineered layouts.
Power, cooling, water demand, acoustics, ecological impacts, security and permitting require site-specific studies. Solar tracking, shading and rainwater collection are concepts for technical evaluation; the visualizations do not establish performance or regulatory compliance. The design vision would be coordinated with the construction team before execution.
Source context checked November 7, 2026. Tristan Scott Design is not affiliated with, endorsed by or retained by SpaceX or Tombstone Resources for these studies.
One Design Language. Individually Tailored Facilities.
Hyperscale campus study · Nine coordinated views
Regional campus study · Nine coordinated views
Relay · viewing
Compact edge-facility study · Nine coordinated views
Interested in the Relay approach? Let’s discuss a full-design role for your facility and how it would be coordinated with your engineering and construction team.
Discuss Relay designAlternative independent studies—not three announced developments. Read the Cochise County proposal overview.